Projects
United Aircraft Corporation
Designed facility area: 300 m2
As part of the project, R-Technologies acted as a General Designer and Subcontractor for a number of engineering sections.
R-Technologies developed working documentation for the chaptersVentilation, Air conditioning, Power supply, Automation. Then, according to the approved documentation, construction and installation as well as commissioning were performed.
Within the frameworkof this project, a system of the microclimate maintaining in the rooms for the function test stands used for developing and debugging of the software for the MC21 and IL112 aircraft was completed.
Design, as well as construction and installation works, were carried out in parallel with the technological equipment (test facilities) installation. The tight schedule was due to the need to quickly complete the next stage of the MS-21 aircraft preparation for ground and flight tests in terms of the avionics development and certification.