Projects
NIIME and Mikron OJSC
Customer:NIIME and Mikron OJSC
Implementation period:2015
Object location:Zelenograd
Project:Creation of industrial and centralized make-up air and exhaust ventilation systems, automatic control on the hydrogen chloride concentration in the manufacturing area, automation of industrial ventilation at the production area and the laboratory of the industrial wastewater treatment plant
The industrial wastewater treatment plant of OJSC NIIME and Mikron is designed to neutralize wastewater from all production buildings before transferring them to urban sewage systems.The station is made with the Hager + Elsässer equipment.
R-Technologies acted as a Subcontractor and as part of the project completed:
• equipment and necessary components and materials supply for installation and commissioning, as well as testing;
• dismantling, construction and installation works, civil works including connecting of the supplied and installed equipment;
• commissioning and testing, including the provision of the systems with the expendable materials necessary for such works and testing.
Letter of thanks