Projects

SPC SpetzElektronSistemy CJSC

Customer:SPC SpetzElektronSistemy CJSC
Implementation period:2014-2015
Object location:Dolgoprudny City, Moscow Region
Project:Development of a complete set of detailed design for the construction of a production premise for 3D ceramic modules manufacturing with using Low Temperature Co-fired Ceramics technology LTCC
Project features:

Designed facility area: more than 2000 m2

 

Cleanroom area: 1000 m2

 

Cleanness class: 7 ISO

In terms of the project, R-Technologies acted as a General Designer. We developed all chapters of the documentation necessary for the construction of turnkey production facility.

Since the building, designed for production facilities installation, was built in the 20-s of the 20th century, a significant further development of the infrastructure was required both for the structural part and for engineering systems.

 

Branch-new systems for the microclimate creating and maintaining, systems for compressed dry air generation and distribution, main and special gases were developed, and a proper chilled water station was designed.

The project included the electric power supply according to special 1-st reliability category.