Projects
SPC SpetzElektronSistemy CJSC
Designed facility area: more than 2000 m2
Cleanroom area: 1000 m2
Cleanness class: 7 ISO
In terms of the project, R-Technologies acted as a General Designer. We developed all chapters of the documentation necessary for the construction of turnkey production facility.
Since the building, designed for production facilities installation, was built in the 20-s of the 20th century, a significant further development of the infrastructure was required both for the structural part and for engineering systems.
Branch-new systems for the microclimate creating and maintaining, systems for compressed dry air generation and distribution, main and special gases were developed, and a proper chilled water station was designed.
The project included the electric power supply according to special 1-st reliability category.