Commissioning works
R-Technologies provides all types of commissioning, heating points, heating systems, ventilation, and hot water systems before the facility substantial completion with all types of as-built documentation.
Commissioning is a set of works made to verify, test and set up systems and equipment to ensure the constrained parameters. The work is carried out in three stages: pre-construction activities; individual acceptance tests; integrated testing.
We set up:
- ventilation and air conditioning systems
- water supply and heat supply systems
- fire extinguishing systems
- electric devices
- chilled water systems.
Commissioning is an important, complicated, and demanding process that requires a comprehensive approach. The right choice of a commissioning company provides the technical measures safety, the successful functioning of engineering systems, the enterprise high efficiency and financial indicators. Only a specialized and experienced company is able to ensure a proper commissioning.
In addition to commissioning, we also provide cleanrooms certification.
Certification means checking the operating modes of a clean room and documenting their compliance with the rules and regulations, monitoring the actual value of the calculated concentration of particles in the air, as well as other parameters set by the standards.
Cleanroom state:
- As built: Corresponds to an as built room. Engineering systems are connected. At that, technological equipment, materials and personnel are absent.
- At rest. The room is fully equipped with operating technological equipment. The personnel are absent.
- Operational: The room is functioning in a required mode. The personnel perform job functions.
R-Technologies performs integrated testing of cleanrooms at the DQ, IQ, OQ, PQ stages.
- Project Qualification (DQ) is an expert examination aimed at confirming the correctness of the project documentation implementation.
- Installation Qualification, IQ is a documentary evidence of the full compliance of the installed cleanroom with the design documentation.
- Operational Qualification, OQ is a documentary confirmation of the compliance of all construction and engineering systems with the approved project. Technical conclusion on the installed equipment proper functioning.
- Performance Qualification, PQ is a documentary confirmation of all systems normal operating modes. Full compliance with the required cleanness class, as well as with the common stated technological parameters.
Cleanroom testing includes the following operations:
- Control of the supply and exhaust airflowso0;
- Control of the actual value of the particles concentration in the air;
- Monitoring of air pressure differences between individual rooms and areas;
- Monitoring of high-performance filters proper installation;
- Monitoring of air leakage through the partitions;
- Concentration of aerosols and microorganisms (if necessary);
- Subsequent tests.
To get the engineering systems commissioning or clean room certification cost estimation, just send a request to our email address or contact us by phone in the contact information.